the brief
5-story self-storage building with 89,715 SF of gross floor area located next to Target in Butler Plaza.
services provided
Engineering
- Provided due diligence services & prepared conceptual plans
- Developed full construction plans for complete civil design of the project and all associated site improvements, including utility and stormwater infrastructure
- Prepared application materials, managed the site plan permitting process, and secured major development plan approval from the City of Gainesville's Development Review Board
- Designed and permitted GRU water and sewer services and incorporated GRU electric design into civil plans
- Permitted a modification to the existing St. Johns River Water Management District Individual Environmental Resource Permit for the site, including preparation of stormwater calculations demonstrating compliance with the master drainage system
Surveying
- Performed a title commitment review
- Prepared ALTA/NSPS Land Title Survey, showing Schedule B-II Exceptions
- Prepared detailed topographic survey of the subject property showing the locations of trees, above-ground improvements, and underground utilities
- Provided field verification of survey control points/benchmark locations
- Prepared legal sketches and descriptions of easements for public utilities and sidewalks
- Provided a specific purpose survey to locate a concrete foundation for setback compliance
- Performed construction staking
- Prepared an as-built survey for the for the purpose of verifying the location & elevation of paving, drainage, sanitary sewer, and above ground water fixtures